Soil Remediation
Offering Optimal Solutions Ranging
from Surveys and Consulting to Remediation Treatment
in Accordance
with the Soil Contamination Countermeasures Act of Japan
We make a comprehensive judgment based on various conditions and propose the best solution.
After the soil remediation, the soil is reused as aggregate, backfill, or horticultural soil.
Surveying and Consulting
Our experienced and knowledgeable engineers will meet your needs, handling everything from survey planning to on-site survey, analysis, and eval-uation.
Remediation methods
Pyrolysis, melting
High-temperature heat treatment renders PCBs and other toxic sub-stances contained in contaminated soil harmless.
Permitted capacity: 487t/day

Soil washing
Toxic substances are separated and removed from contaminated soil by washing using friction and water flow.
Permitted capacity: 708t/day

Dry magnetic extraction
Dry magnetic extraction (DME) treatment is performed by mixing iron powder with contaminated soil and using magnetic force to separate and remove heavy metals and other toxic substances.
Permitted capacity: 2,520t/day

Sorting, insolubilization, and chemical desorption
In addition to moisture content adjustment and foreign matter removal, insolubilization treatment to reduce elution of Class II designated hazard-ous substances by chemicals, etc., and chemical desorption to volatilize and remove Class I designated hazardous substances by utilizing the heat of hydration with quicklime are also performed.
Permitted capacity: 8,200t/day

*As of October 2022
Conversion of soil into raw material for cement
We work with cement companies to actively utilize treatment to convert low-concentration contaminated soil into raw material for cement.
In-situ countermeasures
In addition to the removal of contaminated soil, we propose in-situ countermeasures.
Purification facilities
Mie Recycle Center, Mie Chuo Kaihatsu
(Iga City, Mie Prefecture)
Pyrolysis facilities, melting (GeoMelt method) facilities, insolubili-zation facilities

Geo-Re Japan
(Amagasaki City, Hyogo Prefecture)
We have a dedicated berth and can receive cargo from the sea. Pyrolysis facilities, washing facilities, dry magnetic extraction facilities, insolubilization and chemical desorption facilities

Safety Island
(Kobe City, Hyogo Prefecture)
We have a dedicated berth and can receive cargo from the sea. Sorting facilities, washing facilities

Landfill disposal facilities
We operate three facilities for the landfill of soil and other materials after sorting and insolubilization
Miki Recycle Center
Gobo Recycle Center
Mie Recycle Center